The Streets Division is responsible for maintenance and minor repairs to the City’s roadways, storm drains, curbs, gutters, sidewalks, and maintenance of roadway signs, roadway markings (paint), signals, streetlights, and debris removal.
Proposition 1B-Local Streets and Roads Improvement, Congestion Relief, and Traffic Safety Account Funds
Proposition 1B provided $19.925 billion in bond funds for a variety of transportation priorities, including $2 billion for cities and counties to fund local maintenance and improvement projects. For 2007 $950 million will be available for local transportation projects. Of this amount, $550 million will be allocated to cities and $400 million will be allocated to counties. The share is determined by the State Controller's Office, with county shares being calculated based on the number of registered vehicles and the number miles of road in the county, and the county and city being calculated based on population, except that each city will receive a minimum of $400,000. The City of Saratoga total share is $982,904.
The City of Saratoga will be utilizing the second round funds in the amount of $466,818 for paving City streets per the attached list below. The scope of the project includes furnishing all materials, equipment, and labor to perform asphalt overlay work and re-stripe segments of public roadway.
The following streets will be pave under the 2009-10 Appropriations Proposition 1B funds:
|
Road Names
|
Begin Location
|
End Location
|
|
MCFARLAND
|
DEVON AVE
|
DEVON AVE
|
|
MEADOW OAK RD
|
VIA RONCOLE
|
END AT MAUREEN
|
|
MICHAELS DR
|
DORSEY WY
|
END
|
|
MILLER AVE
|
DORCHESTER DR
|
COX AVE
|
|
PROSPECT RD
|
LAWRENCE EXP
|
SARATOGA AVE
|
|
REID CT
|
REID LN
|
END
|
|
TEN OAKS CT
|
TEN OAKS LN
|
END
|
|
TWAIN CT
|
MANTECA
|
END
|
|
VERDE VISTA CT
|
VERDE VISTA LN
|
END
|
|
VIA GRANDE DR
|
CHARTERS AVE
|
GLEN BRAE
|